Place of Origin: | China |
---|---|
Brand Name: | HaoTuo |
Certification: | ISO9001 QS SGS |
Model Number: | HT-L003 |
Minimum Order Quantity: | 20000pcs |
Price: | Negotiation |
Packaging Details: | Carton Size:60*32*38cm Quantity/CTN:1000pcs, N.W.:12KGS G.W.:13KGS |
Delivery Time: | 20-25 days after payment |
Payment Terms: | T/T, L/C |
Supply Ability: | 600000 Pieces per Month |
Product Name: | Ribbed Closure Lotion Dispenser Pump | Material: | PP/PE |
---|---|---|---|
Type: | Lotion Dispenser Pump | Useage: | Cleaning Water Ect. |
Samples: | Freely | Color: | Any |
Discharge Rate: | 2.0+/-0.20ML/T | Closure Options: | Ribbed, Smooth, Aluminum |
Neck Size: | 24/410 28/410 24/415 28/415 | ||
High Light: | liquid soap dispenser pump,foaming soap dispenser pump |
Quick details:
Item name | Plastic lotion pump |
Model | HT-L003 |
Closure options | Ribbed, Smooth, Aluminum |
Application | Body lotion bottles, cleaning bottles ect. |
Features | Ergonomic design |
Discharge rate | 2.0+-0.2ml/t |
Features
1. The most popular dispenser sprayer pump proven reliability, stable quality.
2. Lots of lotion pump . can meet different demands
3. Various shroud design, also can accept customized design.
4. Different closure size available, 28/400, 28/410, 28/415, rachet closure.
5. It compatible with big range of products.
6. Quick priming.
Applications
1. Household chemicals
2. Automotive care products.
3. Shampoo pump bottle
Our Service
1) Welcome free samples
2) Welcome small orders
3) Welcome oem service
4) Quick lead time
5) High percent products spot check
FAQ
Q:Are you a manufacturer or a trading company?
A:We have our own manufacturer, welcome to visit our factory.
Q:How do I pay for my purchase?
A:We accept the following payment methods: T/T, western union.
Q:Do you supply free sample?
A:If the sample quantity is not big, we will offer free samples, if big, the courier cost should be paid.
Q:How soon can I get my order if I pay deposit?
A:1)Normmal delivery time is 20-25 days.Certain package needs a little long time,so delivery time will be discussed.
2) package have stock,the finished product delivery time is 10-15 days.